Back

Work Related to the Tolling System – October 6 to October 10

Time: 10:00 p.m. to 5:30 a.m.
Location: kilometers 14.1 to 14.3


Nighttime work will be carried out to install fiber optic cables as part of the tolling system infrastructure. To ensure safety, some lanes will be temporarily closed. However, no major impact on traffic is expected.

Speed in the work zone is reduced to 80 km/h.


Thank you for your attention and cooperation!